When to bring us in
- You are selecting a new electronics supplier or placing a first substantial order.
- You need to confirm capability before increasing volume.
- You want a focused assessment of a supplier you have already found.
What the work covers
- Map the actual process route, critical steps and outsourced operations.
- Review bottleneck cycle times, shifts, yield assumptions, changeovers and existing commitments.
- Examine key-material availability and the basis of the proposed schedule.
- Review assembly controls, functional testing, traceability, rework and engineering changes.
- Identify evidence gaps and the conditions needed before trial or volume release.
What you receive
Capability & risk report
Findings linked to the product and order, with sources, assumptions and confidence limitations.
Capacity model
A transparent calculation of key constraints, effective output and scenarios where evidence permits.
Action & decision register
Prioritized corrective actions and conditions for proceeding, further trial or reassessment.
How we scope the project
Share your product category, project stage, supplier location if known, order requirements and target dates. We confirm the technical fit, required evidence, on-site work and deliverables before quoting.
An assessment is a time-specific review within an agreed scope. It is not a certification, laboratory test or guarantee of future output. Specialist testing can be arranged separately with an appropriate provider.
Explore illustrative deliverables ↗