INSIDE THE DELIVERABLES

Evidence you can follow.
Actions you can use.

A selection of illustrative working outputs. Actual reports are scoped to the product, available evidence and decision being made.

Illustrative example—not a client case. All supplier names, figures and findings below are fictional. They demonstrate the assessment method and are not a certification or performance guarantee.

01 / Supplier comparison

Example brief: an industrial terminal, first order of 2,000 units, with defined functional tests. Candidates are compared on the same revision and scope before a recommendation.

Decision factorCandidate ACandidate BEvidence needed
Relevant process experienceRelated terminal assemblyRelated controller assemblyComparable build records and process route
Quoted scopeTest fixture excludedTest fixture included, software scope unclearNormalize fixture, software and test responsibilities
Production commitment30 days after material readiness40 days after sample approvalAlign start condition and verify bottleneck load
Next stepReview test preparation and available capacityClarify software scope and pilot planDo not rank candidates on unit price alone

02 / Bottleneck capacity calculation

Assume an illustrative functional test takes 8 minutes per unit per station, including handling. Two stations are available. Scheduled time is 480 minutes per station per day, with an 85% effective-time factor and 95% first-pass yield.

TRANSPARENT INPUTS · EXPLICIT ASSUMPTIONS

2 × 480 × 85% ÷ 8 × 95%
≈ 97 first-pass good units / day

Across 20 production days: approximately 1,938 units before allowing for other committed work or additional losses. Against a 2,000-unit requirement, this scenario does not establish adequate capacity.

DECISION IMPLICATION

Verify actual station occupancy, repeat-test load and measured cycle time. Qualify additional resources or agree a revised delivery plan before committing the full order.

This simplified model is a screening scenario. Effective-time and yield definitions must be aligned to avoid double counting losses. Actual assessment requires product-matched observations and records.

03 / Production readiness gate

GateRequired evidenceExample statusRelease condition
BOM & revisionApproved BOM, drawings and substitution recordOpen: alternate component pendingBuyer design authority confirms the substitution
Test preparationQualified fixture, approved software and test recordsOpen: second fixture not qualifiedDemonstrate repeatable results on each fixture
Pilot buildYield, defect analysis and rework recordsTrial not yet completedAgree acceptance criteria and close critical findings
Material readinessStock verification and confirmed key-part arrivalsPartially evidencedConfirm delivery dates and impact of shortages

04 / Corrective-action register

FindingPriority & impactOwner / timingClosure evidence
Unqualified additional test stationHigh · output constraintSupplier test engineering / before volume releaseValidation results and witnessed repeat test
Unconfirmed key-component arrivalHigh · start-date uncertaintySupplier purchasing / before schedule approvalArrival evidence and verified material allocation
Work instruction does not match revisionHigh · assembly error riskSupplier engineering / before pilotApproved revision at point of use and operator briefing

What accompanies the final report

Scope & evidence register

Product, site, date, records examined, observations and limitations.

Findings discussion

Explanation of material risks, unresolved questions and decision conditions.

Further site work, specialist tests and corrective-action verification are quoted or included according to the agreed scope.